    Case study – Fairlawn Primary School, Bristol


    Key Facts

    • Value : £500k
    • Sector : Education
    • Main Contractor : Skanska PLC
    • Start Date : March 2015
    • Duration : Ongoing

    This has been one of our most substantial projects to date and has given this listed building a fresh but characteristic new look.

    Fairlawn primary school project is a complete refurbishment of what was formerly Fairfield Grammar School in Bristol.

    Our contract with Skanska was to renew all roof coverings to the complete school area comprising to around 30000 tiles (Approximately 2800 square metres).

    This is an extremely challenging project as the building is Victorian ageing from 1898 and is split over forty eight individual roof elevations including flat, pitched and bonnet roofs.
    The project also included renewal of all lead valleys, soakers and box gutters including some very intricate lead details.

    Working with this major contractor we have received great feedback in relation to the works carried out, we have also built up a good relationship with them and adhered to their high levels of health and safety.